{"id":4413,"date":"2025-06-06T20:56:00","date_gmt":"2025-06-06T13:56:00","guid":{"rendered":"https:\/\/meteo.itb.ac.id\/?p=4413"},"modified":"2026-08-14T21:02:44","modified_gmt":"2026-08-14T14:02:44","slug":"zephyrus-itb-conducts-surveys-and-maintenance-of-flood-monitoring-instruments-in-majalaya-and-paseh","status":"publish","type":"post","link":"https:\/\/meteo.itb.ac.id\/?p=4413&lang=en","title":{"rendered":"Zephyrus ITB Conducts Surveys and Maintenance of Flood Monitoring Instruments in Majalaya and Paseh"},"content":{"rendered":"\n<p>Writer : Daffa Tsabat (Meteorologi, 2023)<br>Editor : Mely Anggrini (Meteorologi, 2022)<br>Translator : Aisyah Nurdiva Dewary Priatna (Meteorologi, 2024)<\/p>\n\n\n\n<!--more-->\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"940\" height=\"705\" src=\"https:\/\/meteo.itb.ac.id\/wp-content\/uploads\/sites\/340\/2025\/06\/image.png\" alt=\"\" class=\"wp-image-3301\" srcset=\"https:\/\/meteo.itb.ac.id\/wp-content\/uploads\/sites\/340\/2025\/06\/image.png 940w, https:\/\/meteo.itb.ac.id\/wp-content\/uploads\/sites\/340\/2025\/06\/image-300x225.png 300w, https:\/\/meteo.itb.ac.id\/wp-content\/uploads\/sites\/340\/2025\/06\/image-768x576.png 768w\" sizes=\"auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><figcaption class=\"wp-element-caption\">The Zephyrus ITB team carried out instrument maintenance in Bandung Regency.<\/figcaption><\/figure>\n\n\n\n<p><strong>MAJALAYA, meteo.itb.ac.id<\/strong> \u2013 BSO Zephyrus HMME \u201cAtmosphaira\u201d ITB conducted a field activity titled &#8220;Initial Steps to Strengthen the Flood Monitoring System&#8221;. This activity involved surveying sites for the installation of new instruments and performing maintenance on existing flood monitoring equipment in the Majalaya and Paseh Districts of Bandung Regency on Thursday (May 1, 2025) and Tuesday (May 13, 2025).<\/p>\n\n\n\n<p><strong>Initial Survey on Jl. Sanding, Paseh District<\/strong><\/p>\n\n\n\n<p>On Thursday (May 1, 2025), the Zephyrus team conducted an initial survey at two potential sites for flood monitoring instruments on Jl. Sanding, Paseh District. These locations were selected based on input from the local Community Association (RW) head and representatives from the disaster preparedness community, <em>Jaga Balai<\/em>. The first site is a flood-prone area that frequently draws complaints from residents due to rapidly rising water levels that cause runoff into downstream areas. The second site was recommended because it is located further upstream than the first. The hope is that installing instruments at both locations will provide earlier warnings, giving residents time to prepare when water discharge surges.<\/p>\n\n\n\n<p>However, the survey encountered challenges regarding difficult terrain and the fact that the land is private property, necessitating a follow-up survey process. Despite this, the team decided to keep both sites under consideration as potential locations while awaiting the permitting process with the landowners.<\/p>\n\n\n\n<p><strong>Instrument Maintenance at the Cibangoak and Ciharus Rivers<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"867\" src=\"https:\/\/meteo.itb.ac.id\/wp-content\/uploads\/sites\/340\/2025\/06\/Screenshot-2025-06-07-090147-1-1024x867.png\" alt=\"\" class=\"wp-image-3311\" srcset=\"https:\/\/meteo.itb.ac.id\/wp-content\/uploads\/sites\/340\/2025\/06\/Screenshot-2025-06-07-090147-1-1024x867.png 1024w, https:\/\/meteo.itb.ac.id\/wp-content\/uploads\/sites\/340\/2025\/06\/Screenshot-2025-06-07-090147-1-300x254.png 300w, https:\/\/meteo.itb.ac.id\/wp-content\/uploads\/sites\/340\/2025\/06\/Screenshot-2025-06-07-090147-1-768x650.png 768w, https:\/\/meteo.itb.ac.id\/wp-content\/uploads\/sites\/340\/2025\/06\/Screenshot-2025-06-07-090147-1-1536x1300.png 1536w, https:\/\/meteo.itb.ac.id\/wp-content\/uploads\/sites\/340\/2025\/06\/Screenshot-2025-06-07-090147-1-2048x1734.png 2048w\" sizes=\"auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><figcaption class=\"wp-element-caption\">Re-arrangement of solar panels and instrument cables disrupted by wild vegetation growth.<\/figcaption><\/figure>\n\n\n\n<p>Activities continued on Tuesday (May 13, 2025), focusing on the maintenance of Automatic Rainfall Recorder (ARR) instruments\u2014used to measure rainfall\u2014and Automatic Water Level Recorder (AWLR) units\u2014used to measure river water levels\u2014at two locations: the Cibangoak and Ciharus rivers in Majalaya. At the Cibangoak Intake, the team cleaned solar panels, checked battery voltage, and installed a voltage sensor on the new battery to facilitate real-time power monitoring. Meanwhile, at Sasak Ciharus, the team encountered an issue where a solar panel was not properly connected, causing operational disruptions. Immediate repairs were carried out, including tidying up the wiring and clearing vegetation around the panel to optimize sunlight absorption.<\/p>\n\n\n\n<p>This series of activities highlights the importance of a technology-driven approach to flood monitoring systems. While the ARR and AWLR serve as the primary instruments, the addition of a battery voltage sensor represents an innovative step toward monitoring equipment health online.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"809\" height=\"528\" src=\"https:\/\/meteo.itb.ac.id\/wp-content\/uploads\/sites\/340\/2025\/06\/image-2.png\" alt=\"\" class=\"wp-image-3303\" srcset=\"https:\/\/meteo.itb.ac.id\/wp-content\/uploads\/sites\/340\/2025\/06\/image-2.png 809w, https:\/\/meteo.itb.ac.id\/wp-content\/uploads\/sites\/340\/2025\/06\/image-2-300x196.png 300w, https:\/\/meteo.itb.ac.id\/wp-content\/uploads\/sites\/340\/2025\/06\/image-2-768x501.png 768w\" sizes=\"auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><figcaption class=\"wp-element-caption\">Pemantauan dan pembersihan modem instrumen yang dikerubuni oleh serangga.Monitoring and cleaning of insect-infested instrument modems.<\/figcaption><\/figure>\n\n\n\n<p>Febri, a member of the Zephyrus Research and Development Division (technology development), explained that the challenges encountered in the field were not solely technical in nature. Difficult terrain, limited access, and environmental factors\u2014such as interference from insects\u2014provided important lessons for the Zephyrus team.<\/p>\n\n\n\n<p>\u201cEquipment issues often stemmed from simple matters, such as interference from ants. This highlights the importance of paying attention to the environment surrounding the instruments,\u201d Febri explained.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"692\" height=\"762\" src=\"https:\/\/meteo.itb.ac.id\/wp-content\/uploads\/sites\/340\/2025\/06\/image-3.png\" alt=\"\" class=\"wp-image-3304\" srcset=\"https:\/\/meteo.itb.ac.id\/wp-content\/uploads\/sites\/340\/2025\/06\/image-3.png 692w, https:\/\/meteo.itb.ac.id\/wp-content\/uploads\/sites\/340\/2025\/06\/image-3-272x300.png 272w\" sizes=\"auto, (max-width: 692px) 100vw, 692px\" \/><figcaption class=\"wp-element-caption\">Maintenance of AWLR and ARR equipment at Sasak Ciharus, Majalaya.<\/figcaption><\/figure>\n\n\n\n<p>For the Zephyrus team, this activity was more than just a technical task; it marked the beginning of a process of renewal and collective learning. Many new members of the Zephyrus 2025 team gained firsthand experience with field dynamics\u2014ranging from the scorching heat and challenging terrain to the technical procedures and on-site communication.<\/p>\n\n\n\n<p>\u201cIt was exhausting and hot, but satisfying. Through this activity, I gained a direct understanding of the site conditions and how the equipment actually functions,\u201d said Gery from the Operations Division.<\/p>\n\n\n\n<p>This activity is expected to serve as a solid foundation for the future development of the Zephyrus flood monitoring system, making it more robust, inclusive, and adaptable to real-world field challenges.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Writer : Daffa Tsabat (Meteorologi, 2023)Editor : Mely Anggrini (Meteorologi, 2022)Translator : Aisyah Nurdiva Dewary Priatna (Meteorologi, 2024)<\/p>\n","protected":false},"author":1347,"featured_media":3301,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"class_list":["post-4413","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-announcement"],"_links":{"self":[{"href":"https:\/\/meteo.itb.ac.id\/index.php?rest_route=\/wp\/v2\/posts\/4413","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/meteo.itb.ac.id\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/meteo.itb.ac.id\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/meteo.itb.ac.id\/index.php?rest_route=\/wp\/v2\/users\/1347"}],"replies":[{"embeddable":true,"href":"https:\/\/meteo.itb.ac.id\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4413"}],"version-history":[{"count":1,"href":"https:\/\/meteo.itb.ac.id\/index.php?rest_route=\/wp\/v2\/posts\/4413\/revisions"}],"predecessor-version":[{"id":4414,"href":"https:\/\/meteo.itb.ac.id\/index.php?rest_route=\/wp\/v2\/posts\/4413\/revisions\/4414"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/meteo.itb.ac.id\/index.php?rest_route=\/wp\/v2\/media\/3301"}],"wp:attachment":[{"href":"https:\/\/meteo.itb.ac.id\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4413"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/meteo.itb.ac.id\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4413"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/meteo.itb.ac.id\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4413"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}